From a 23-year CT contractor. Plus what to expect during the project.

⭐ 4.9 GoogleBBB A+Licensed & Insured23+ years · Since 2003Written workmanship warranty
4.9 ★Google Rating
BBB A+ 
23+ yearsSince 2003
Licensed & InsuredCT & NY
Pay AfterWorkmanship Warranty

Once you've signed the contract, there are a handful of things you can do (and a handful of things you shouldn't) to make sure the prep stage goes smoothly. Most of this is straightforward — but the small details affect the project timeline more than people expect.

Two weeks before we arrive.

  1. Trim back foliage against the house. Rhododendron, hydrangea, and ivy growing onto siding all need to be cut back at least 18 inches.
  2. Schedule pet care for the prep days specifically — power-washing and sanding are stressful for dogs.
  3. Move outdoor furniture away from the house perimeter — at least 6 feet of clearance for ladder staging.
  4. Confirm color choices in writing. Paint should be ordered to arrive 48 hours before painting day; last-minute color changes push the start date.
  5. Coordinate access for any side gates, garage codes, or alarm systems.

Day of arrival.

  1. Park your cars away from the perimeter.
  2. Close all windows and storm windows on the elevations being prepped.
  3. Remove window screens (we'll do this if you prefer — but it's faster if it's already done).
  4. Take down anything mounted to the siding: lanterns, addresses, decorative plaques.
  5. Identify any fragile features (security cameras, satellite dishes, dog runs) for the foreman.

What you don't need to do.

What to expect during the project.

Day 1–2: prep stage

Soft-wash the entire exterior. The home will be wet for 24 hours — paint cannot start until it's dry.

Day 2–4: scrape, sand, repair

Hand-scrape all loose paint. Sand transitions smooth. Replace rotted wood. Spot-prime bare wood. This is the noisiest stage.

Day 4–5: caulk and prime

Full caulk on every joint. Final spot-priming of any newly exposed wood.

Day 5–7: paint application

First coat. Cure 24 hours. Second coat.

Final day: walk-through

You walk the home with the foreman. Anything you flag gets touched up the same day.

Weather contingency.

We watch the dew point as carefully as the temperature. If overnight temperatures will drop below the dew point with paint on the wall, we don't paint that day — paint that's still curing when condensation forms will fail in 18 months. This means we sometimes pause for a day mid-project. We never paint to a deadline at the cost of a 10-year result.

Frequently Asked Questions.

Should I power-wash my home before the painters arrive?

No — leave that to us. Soft-wash is part of the prep protocol and the timing is sensitive (the home needs 24+ hours to dry before any paint or scraping).

How long does an exterior repaint take?

5–10 working days for a typical 2,500 sq-ft colonial. Larger homes and cedar restorations run 2–3 weeks. Weather pauses can extend this.

Do I need to be home during the project?

Just for the start and end walk-throughs. Day-to-day, you don't need to be present unless you'd like to be.

What happens if it rains during the project?

We pause and resume when conditions are safe. We'd rather extend the project by a day than risk paint failure 18 months later.

Local Painters by Town.

More Resources.

Ready to Talk About Your Exterior Project?

Free on-site estimate within 48 hours. No pressure, no pushy sales — just an honest written quote you can take to other contractors.

Free · No Pressure · Your Info Is Private.

Or call directly: (203) 456-1375 · Mon–Fri 9am–5pm · Sat 9am–2pm