From a 23-year CT contractor. Plus what to expect during the project.
Once you've signed the contract, there are a handful of things you can do (and a handful of things you shouldn't) to make sure the prep stage goes smoothly. Most of this is straightforward — but the small details affect the project timeline more than people expect.
Soft-wash the entire exterior. The home will be wet for 24 hours — paint cannot start until it's dry.
Hand-scrape all loose paint. Sand transitions smooth. Replace rotted wood. Spot-prime bare wood. This is the noisiest stage.
Full caulk on every joint. Final spot-priming of any newly exposed wood.
First coat. Cure 24 hours. Second coat.
You walk the home with the foreman. Anything you flag gets touched up the same day.
We watch the dew point as carefully as the temperature. If overnight temperatures will drop below the dew point with paint on the wall, we don't paint that day — paint that's still curing when condensation forms will fail in 18 months. This means we sometimes pause for a day mid-project. We never paint to a deadline at the cost of a 10-year result.
No — leave that to us. Soft-wash is part of the prep protocol and the timing is sensitive (the home needs 24+ hours to dry before any paint or scraping).
5–10 working days for a typical 2,500 sq-ft colonial. Larger homes and cedar restorations run 2–3 weeks. Weather pauses can extend this.
Just for the start and end walk-throughs. Day-to-day, you don't need to be present unless you'd like to be.
We pause and resume when conditions are safe. We'd rather extend the project by a day than risk paint failure 18 months later.
Free on-site estimate within 48 hours. No pressure, no pushy sales — just an honest written quote you can take to other contractors.